Loads with Multiple Datasets #99

Open
opened 2024-05-03 15:33:58 +00:00 by clive · 0 comments
Collaborator

As discussed with @allan, one useful feature to have for us would be the ability to upload changes to multiple datasets as a single Excel file (with each sheet containing changes for one dataset) or dragging + dropping several suitably named files (so we can keep csv uploads).

I think Allan mentioned having a dropdown menu where you could select which datasets were being edited.

The reason we would like this is that we have processes where we end up with a lot of csv / Excel files that we need to drag and drop in succession to edit different tables. And then you have to wait in between each file upload.

The main problem that I can see for us is that we sometimes have file uploads that need to be split up into smaller ones else we hit a stored process (not enough memory) error. If we had uploaded multiple files / sheets and included a too-large change then the process should be able to handle this somewhat cleanly?

This one is a medium priority for us.

As discussed with @allan, one useful feature to have for us would be the ability to upload changes to multiple datasets as a single Excel file (with each sheet containing changes for one dataset) or dragging + dropping several suitably named files (so we can keep csv uploads). I think Allan mentioned having a dropdown menu where you could select which datasets were being edited. The reason we would like this is that we have processes where we end up with a lot of csv / Excel files that we need to drag and drop in succession to edit different tables. And then you have to wait in between each file upload. The main problem that I can see for us is that we sometimes have file uploads that need to be split up into smaller ones else we hit a stored process (not enough memory) error. If we had uploaded multiple files / sheets and included a too-large change then the process should be able to handle this somewhat cleanly? This one is a medium priority for us.
mihajlo self-assigned this 2024-05-08 10:42:10 +00:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: dc/dc#99
No description provided.